After creating the design and preparing the plans and specifications to repair a timber boardwalk at Yates Mill Park, Alpha & Omega Group provided construction administration services to complete and oversee the boardwalk repairs as well as the construction of structures along the boardwalk.

The timber deck and rails of the wetlands boardwalk were replaced with a composite material. The original observation bump-outs were built on an angle, but our design squared them off. A roof structure was also added to cover the observation bump-outs.

A&O’s construction administration manager scheduled a pre-bid conference, issued addenda and made a recommendation for award. After selection, A&O scheduled and conducted a pre-construction conference. J.C. Edwards, Inc. was selected as the contractor. During the construction period, A&O scheduled and held progress meetings and oversaw close-out documentation before final completion. The Pond Boardwalk is scheduled for repairs at a later date. Ω


Relevant images

 
 

similar and Related